- nr.2 KAPPA V EVO A HP 80.2 SLN
- Nr.1 TETRIS A+ 27.6 LN
Installed at Centro Direzionale MPS (Monte dei Paschi di Siena Bank) - Siena.
Shot by Luca Zordan / Swegon Italia
2 water/water units cooling and 1 water/water HPW to cool/heat production facility
LD Engineering was awarded and delivered the complete renovation of the main offices of the Panhellenic pharmaceutical association. Two Blue...