New grandstand RENAISSANCE GEWISS STADIUM ATALANTA BERGAMO Installation of
n. 2 air-cooled machines for indoor installation with side expulsion fans.
Installed models Beta Rev RFE LN HP 24.4 and 10.2 Machines arrived pre-assembled at the construction site,
assembly and reassembly service on site to access the PDC support structure.
2 water/water units cooling and 1 water/water HPW to cool/heat production facility
LD Engineering was awarded and delivered the complete renovation of the main offices of the Panhellenic pharmaceutical association. Two Blue...